June 2017 Draft Supplemental Environmental Impact Statement and Section 4(f) Evaluation
Cover Sheet - Volume 1
Title Sheet (Signed)
TABLE OF CONTENTS
Acronyms and Abbreviations
Glossary of Technical Terms
- Project Overview
- Purpose and Scope of this Draft SEIS
- Environmental Review Process
CHAPTER 2 —ALTERNATIVE CONSIDERED IN THIS DRAFT SEIS
- 2.1 Project Background
-
2.2 Purpose and Need of the Project
2.2.1 Major Activity Centers and Destinations
2.2.2 Travel Markets, Transit Usage, Congestion, and Mobility in the Study Area
2.2.3 Regional Objectives -
2.3 Development of the Alternatives for Section 2 of the Project
2.3.1 Wilshire/Rodeo to Century City Alignment and Century City Station
2.3.2 Century City Station Construction Staging
2.3.3 Elimination of the Double Crossover at Wilshire/Rodeo Station -
2.4 Alternative Considered in this SEIS
2.4.1 Tunnel Alignment and Stations
2.4.2 Century City Constellation Station Construction Staging - 2.5 Section 2 Construction Schedule
- 3.1 Introduction
-
3.2 Construction-related Transportation Impacts
3.2.1 Construction Approach
3.2.2 Public Transit
3.2.3 Streets and Highways
3.2.4 Parking
3.2.5 Pedestrian and Bicycle Network
CHAPTER 4 —ENVIRONMENTAL ANALYSIS, CONSEQUENCES, AND MITIGATION
- 4.1 Introduction
-
4.2 Noise and Vibration
4.2.1 Affected Environment/Existing Conditions
4.2.2 Environmental Impacts/Environmental Consequences
4.2.3 Mitigation Measures -
4.3 Geologic Hazards
4.3.1 Existing Conditions/Affected Environment
4.3.2 Environmental Impacts/Environmental Consequences
4.3.3 Completeness of Information
4.3.4 Mitigation Measures -
4.4 Historic Properties
4.4.1 Affected Environment/Existing Conditions
4.4.2 Environmental Impacts/Environmental Consequences
4.4.3 Mitigation Measures -
4.5 Construction Impacts and Mitigation
4.5.1 Acquisition and Displacement of Existing Uses
4.5.2 Visual Quality
4.5.3 Air Quality
4.5.4 Noise and Vibration
4.5.5 Geological Hazards
4.5.6 Ecosystems and Biological Resources
4.5.7 Parklands and Community Services and Facilities -
4.6 Cumulative Impacts
4.6.1 Methodology
4.6.2 Affected Environment/Existing Conditions
4.6.3 Environmental Impacts/Environmental Consequences
CHAPTER 5 SECTION 4(F) EVALUATION
-
5.1 Section 4(f) Regulatory Framework
5.1.1 Types of Properties Protected by Section 4(f)
5.1.2 Section 4(f) Use
5.1.3 Prudent and Feasible Avoidance Alternatives
5.1.4 All Possible Planning to Minimize Harm
5.1.5 Least Overall Harm -
5.2 Description of Section 4(f) Resources
5.2.1 Perpetual Savings Bank Historic Property
5.2.2 Beverly Hills High School (BHHS) Historic Property
5.2.3 AAA Building Historic Property
5.2.4 Century Plaza Tower Historic Property
5.2.5 Century Plaza Hotel Historic Property
5.2.6 Los Angeles Country Club (South Course) Historic Property
5.2.7 The Barn Historic Property
5.2.8 Beverly Hills High School Recreational Facilities
5.2.9 Roxbury Memorial Park -
5.3 Evaluation of Use of Section 4(f) Resources
5.3.1 Beverly Hills High School Historic Property
5.3.2 AAA Building Historic Property
5.3.3 Beverly Hills High School Recreational Facilities
5.3.4 All Possible Planning to Minimize Harm -
5.4 Avoidance Alternatives
5.4.1 Wilshire Boulevard (No Century City Station)
5.4.2 Santa Monica Boulevard
5.4.3 Century Park A
5.4.4 Century Park B
5.4.5 Century Park C
5.4.6 Summary of Feasibility and Prudence of Avoidance Alternatives -
5.5 Evaluation of Least Overall Harm
5.5.1 Alternatives Considered for Least Overall Harm
5.5.2 Ability to Mitigate Adverse Impacts on Each Section 4(f) Property
5.5.3 Relative Severity of Remaining Harm, after Mitigation, to Protected Activities, Attributes, or Features that Qualify Each Section 4(f) Property for Protection
5.5.4 Relative Significance of Each Section 4(f) Property
5.5.5 Views of the Official(s) with Jurisdiction over Each Section 4(f) Property
5.5.6 Degree to which Each Alternative Meets the Purpose and Need of the Project
5.5.7 After Reasonable Mitigation, the Magnitude of any Adverse Impacts to Resources not Protected by Section 4(f)
5.5.8 Substantial Differences in Costs among Alternatives
5.5.9 Summary of Finding of Least Overall Harm - 5.6 Coordination and Consultation
- 5.7 Preliminary Section 4(f) Finding
CHAPTER 6 —PUBLIC AND AGENCY OUTREACH
- 6.1 Highlights of Previous Outreach Efforts
- 6.2 Public Participation Plan
- 6.3 Public and Agency Comment for the Draft EIS
- 6.4 Section 106 Consultation
- 6.5 Section 4(f) Consultation
S.6 Public and Agency Outreach
Appendices
APPENDIX A: UPDATED MITIGATION MONITORING AND REPORTING PLAN FOR SECTION 2
APPENDIX B: GEOTECHNICAL STUDIES
- Assessment of Tunneling and Station Excavation Risks Associated with Subsurface Gas Along Section 2– Revision 1 (Metro 2017b)
- Westside Subway Extension Geotechnical and Hazardous Materials Technical Report (Metro 2010a)
- Addendum to the Westside Subway Extension Geotechnical and Hazardous Materials Technical Report (Metro 2011b)
-
Westside Subway Extension Preliminary Geotechnical and Environmental Report (Metro 2011g)
Volume 1 : Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6
Volume 2: Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15
Volume 3 : Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 -
Westside Subway Extension Century City Area Fault Investigation Report (Metro 2011c)
- Westside Subway Extension Century City Area Tunneling Safety Report (Metro 2011d)
- Geotechnical Design Memorandum – Section 2, Tunnel Reaches 4 and 5 (Metro 2016e)
- Geotechnical Design Memorandum – Century City Constellation Station (Metro 2016f)
- Geotechnical Design Memorandum – Wilshire/Rodeo Station (Metro 2016g)
- Geotechnical Data Report – Tunnel Reaches 4 and 5 (Metro 2016h) : Part 1 | Part 2 | Part 3 | Part 4 | Part 5
- Geotechnical Data Report – Century City Constellation Station (Metro 2016i) : Part 1 | Part 2
- Environmental Data Report – Century City Constellation Station (Metro 2015a)
- Westside Purple Line Extension Section 2 Geotechnical Fault Investigations Summary Memorandum (Metro 2016a)
- Transcript: Special Meeting of the MTA Board to Conduct Public Hearing, May 17, 2012 (Metro 2012a)
- Reply to Exponent Responses, dated May 15, 2012 (Metro 2012b)
- Response to Leighton Consulting Report, May 14, 2012 (Metro 2012c)
- Final EIS/EIR Presentation to Metro Committee, April 18, 2012 (Metro 2012d)
- Metro Board Report, April 18, 2012 (Metro 2012e)
- Appendix D to Metro Board Report (Metro 2012f)
- Response to Preliminary Review of Comments of Century City Fault Investigation Report by Shannon and Wilson, April 17, 2012 (Metro 2012g)
- Response to Hazard Assessment Study by Exponent, April 4, 2012 (Metro 2012h)
- Report of Independent Review Panel, October 19, 2011 (Metro 2011h)
- Presentation to Planning & Programming Committee, October 19, 2011 (Metro 2011i)
- Tunnel Advisory Panel Final Report, October 2011 (Metro 2011j)
-
Westside Purple Line Extension Project, Section 2 Addendum to the Final Environmental Impacts Report (Metro 2015e)
Part 1 | Part 2 | Part 3 | Part 4 | Part 5 - Fault Investigation Report Transect 9—Tunnel Reach 5 (Metro 2017c)
- Probabilistic Fault Displacement Hazard Evaluation (Metro 2017d)
- Century City TOD and Walk Access Study (Metro 2012i)
- Century City Station Options Updated Jobs and Population Inventory Memorandum (Metro 2011f)
- Updated Direct Ridership Forecasting Report (Metro 2011e)
- Westside Subway Extension Technical Report Summarizing the Results of the Forecasted Alternatives (2012l)
APPENDIX D: TRAFFIC ANALYSIS
- Westside Purple Line Extension, Section 2, Construction Noise and Vibration Evaluation – Revision 1 (Metro 2017e)
- Westside Purple Line Extension Beverly Hills High School Master Plan Ground-borne Vibration Assessment– Revision 1 (Metro 2017f)
- Westside Purple Line Extension AAA Building Construction Noise and Vibration Assessment– Revision 1 (Metro 2017h)
APPENDIX F: AIR QUALITY CONSTRUCTION IMPACTS MEMORANDUM
-
Westside Purple Line Extension Century City Constellation Station Air Quality Technical Memorandum– Revision 1 (Metro 2017g)
This is a ZIP file, containing GIS data.